Abstract:Research purposes: Following the design ideas of " Putting man first, serving the transportation,strengthening the fundament and weakening the trivial,optimizing the system and focusing on the development" ,and considering the current situation and the projects under construction and to be constructed or planned in Shangqiu district,the study is done on determination and the recommendation of the optional schemes for accumulating the experience of studying and designing the general layout of the railway terminal.
Research conclusions: The scheme that Beijing - Kowloon PDL will be led into the existing Shangqiu Station and Zhengzhou - Xuzhou PDL will be led into the existing Shangqiu Station in parallel have evident advantage on station setting,engineering factors,passenger organization,use of the existing infrastructure and setting of contact line. So it is recommended in this paper.
赵升. 郑徐客运专线引入商丘地区设站方案研究[J]. 铁道工程学报, 2011, 28(4): 5-8.
ZHAO Sheng. Study on Schemes for Leading Zhengzhou - Xuzhou PDL into Shangqiu District. 铁道工程学报, 2011, 28(4): 5-8.
The Fourth Survey & Design Institute of China Railway. Technological Handbook of Railway Engineering Design, Station and Terminal [K].Beijing: China Railway Publishing House,2004.
[4] 辛灵. 客运专线引入枢纽相关问题研究[D]. 成都: 西南交通大学, 2008.
Xin Ling. Research on the Relevant Issues of PDL into Terminal [ D ]. Chengdu: Southwest Jiaotong University,2008.
Peng Wensheng,Peng Hui. Layout for Leading PDL into the Passenger Station of the Existing Terminal [J].Journal of Traffic and Transportation Engineering, 2004( 2) : 62 - 65.
[6] 廖天武. 客运专线引入铁路枢纽的关键问题研究[D].成都: 西南交通大学, 2008.
Liao Tianwu. Research on the Key Issues for Leading PDL into Railway Terminal [D]. Chengdu: Southwest Jiaotong University,2008.
Zuo Wu,Zhao Sheng. Research on Schemes of Leading Zhengzhou - Xuzhou Passenger Dedicated Line into Xuzhou Terminal[J]. Journal of Railway Engineering Society,2010( 12) : 5 - 8.