[1]GB 50090—2006,铁路线路设计规范[S].
GB 50090—2006,Code for Design of Railway Line[S].
[2]GB 50091—2006,铁路车站及枢纽设计规范[S].
GB 50091—2006,Code for Design of Railway Station and Terminal [S].
[3]铁建设[2007]47号,新建时速300~350公里客运专线铁路设计暂行规定[S].
Railway Construction [2007] No.47, The Temporary Regulations for the Designs of the Passenger Dedicated Railway with a Speed of 300 km/h to 350km/h [S].
[4]铁道第四勘察设计院. 铁路工程设计技术手册·站场及枢纽[M]. 北京:中国铁道出版社,2004.
The Fourth Survey and Design Institute of China Railways. Railway Engineering Technical Manual- Station Yard and Terminal[K]. China Railway Publishing House,2004.
[5]杨丽华. 新建贵广铁路引入都匀地区方案研究[J]. 铁道运输与经济,2009(5):30-32.
Yang Lihua. Study on Leading-in Scheme for Newly-built GuiGuang Railway in Duyun Area[J]. Railway Transport and Econnmy, 2009(5):30-32.
[6]韩长生. 贵阳东站站型方案研究[J]. 铁道工程学报,2013(6):73-77.
Han Changsheng. Study on Scheme for Selection of Station Type of Guiyang East Station[J].Journal of Railway Engineering Society,2013(6):73-77.
[7]刘世峰. 铁路接轨站设计应考虑的因素[J]. 铁道运输与经济,2005(10):76-78.
Liu Shifeng. Factors to Be Considered in Design of Railway Junction Sration[J]. Railway Transport and Economy, 2005(10):76-78.
[8]刘军强. 敦煌车站站场设计研究[J]. 铁道运输与经济,2007(z):83-85.
Liu Junqiang. Study on Design of Dunhuang Stantion and Yard[J]. Raiyway Transport and Economy,2007(Supplement):83-85.
[9]李杰. 贵广快速铁路贺州站平面布置方案研究[J]. 铁道工程学报,2010(2):89-92.
Li Jie. Study on the Plane Layout of Hezhou Railway Station of Guizhou-Guangzhou Rapid-speed Railway[J]. Journal of Railway Engineering Society,2010(2):89-92.
[10]铁二院工程集团有限责任公司. 新建铁路贵阳至广州线可行性研究[R]. 成都:中铁二院工程集团有限责任公司,2007.
China Railway Eryuan Engineering Group Co.Ltd. Feasibility Study on Newly-built Guiyang-Guangzhou Railway[R]. Chengdu: China Railway Eryuan Engineering Group Co.Ltd,2007. |