Abstract:Research purposes: The occurrence of large deep buried tunnel made a new challenge to the traditional way for engineering geological prospecting and the deep physical exploration of magneto-telluric exploration provided support for solving such problems. The geological information was the basic interpretation for physical exploration and no good result of physical exploration could be obtained without matching geology with physical exploration. The purpose of this paper was to increase the working level of physical exploration and exploration quality for large deep buried tunnel through establishing a working system with equipping certain persons.
Research methods: The features of different modes for matching geology with physical exploration in the past were summed up through construction practice. A new working mode was commended for matching geological person with physical exploration in geological exploration for large complicated tunnel based on taking the quality of physical exploration under different matching modes as standard.
Research results: The working contents of matching geology with physical exploration in every stage were summed up. The working way and content were described in details for matching geological person with physical exploration. The working principle, content and way of physical exploration were presented for physical exploration in every stage according to the requirements of engineering geological prospecting.
Research conclusions: The good result of engineering geological prospecting for large deep-buried tunnel could be obtained only if physical exploration of high level could be adopted widely in overall exploration with assistance of matching given by professional geological person.
张举贤. 浅谈长大深埋隧道工程地质勘察中地质对物探的配合[J]. 铁道工程学报, 2006, 23(3): 17-20.
ZHANG Ju-xian. Comments on Matching Geology with Physical Exploration in Engineering Geological Prospecting for Large Deep Buried Tunnel. 铁道工程学报, 2006, 23(3): 17-20.