Abstract:Research purposes: In order to resolve the difficulties in using”Interim Rules of Risk Evaluating and Management on Railway Tunnels" and”Guideline of Risk Management for Construction of Subway and Underground Works",this paper finds out a risk analysis method with simple used and maneuverability.
Research conclusions :(1)The result indicates that the risks of working drawing design, piling cut and pre-jack are greater than the ones of construction conditions and others.(2)The method of De1Phi uniting AHP could get the half-quantity result, which could meet the requests of”Interim Rules of Risk Evaluating and Management on Railway Tunnels" and "Guideline of Risk Management for Construction of Subway and Underground Works".( 3 ) 1'he method of De1Phi uniting AHP holds true for risk evaluating of simple works and risk identity of complex projects.
李冬梅. 深圳地铁一号线百货广场桩基托换的风险分析研究[J]. 铁道工程学报, 2008, 25(9): 91-94.
LI Dong-mei. Research on the Risk Analysis of Piling Exchange for Metro Line 1 in Shenzhen. 铁道工程学报, 2008, 25(9): 91-94.