Abstract:Abstract:Research purposes: According to the karst phenomenon of the Guiyang to Guangzhou railway during exploitation and construction, this paper analyzes the development of karst and the particularity, then throws out the method of the geological survey and engineering measure of construction. It will have a certain reference value for survey and construction of similar geological condition project.
Research conclusions:(1)The railway should avoid the karst strongly development areas. If the railway cannot avoid the karst area, it should be made as far as possible to the typical karst micro unit area. (2)We must be make full use of the regional geological data to develop the wide area geological investigation, and adopt the comprehensive geological method to survey the geological features of the tunnel, basically make a thorough investigation about the position, altitude and the relationship between the railway and the karst pattern etc., and design the exploration point and the part of the geophysical prospecting to check the phenomenon about the karst feature. (3) For karst tunnels nearby underground river, it is necessary to survey and research its space location characters, and analyze its original and features, than predict its impact on stability of surrounding rock of tunnel by analogy. (4) It is suggested to forecast the development of karst of tunnel by combining the methods of advanced forecasting of tunnel sidewall, geological radar of tunnel base and geological drilling hole of tunnel bottom during construction.
刘建国. 贵广铁路坪山隧道岩溶发育情况分析[J]. 铁道工程学报, 2015, 32(4): 86-.
LIU Jian-guo. Analysis of the Karst Development Instance for Guiguang Pingshan Tunnel. 铁道工程学报, 2015, 32(4): 86-.
[1]楚涌池,李法昶. 铁路工程地质手册(修订版)[M]. 北京:中国铁道出版社,2002.
Chu Yongchi,Li Fachang. Manual for Geology of Railway Engineering (Revison)[M]. Beijing:China Railway Publishing House,2002.
[2]GB 50007—2011,建筑地基基础设计规范[S].
GB 50007—2011,Code for Design of Building Foundation[S].
[3]蒋爵光. 隧道工程地质[M]. 北京:中国铁道出版社,1991.
Jiang Jueguang. Tunnel Engineering Geology[M]. Beijing:China Railway Publishing House,1991.
[4]铁道部第二勘测设计院. 岩溶工程地质[M]. 北京:中国铁道出版社,1984.
The Second Survey Design Institute, Ministry of Railways. Karst Engineering Geology[M]. Beijing:China Railway Publishing House,1984.
[5]吴治生,张杰. 岩溶隧道地质构造与围岩等级的划分[J]. 铁道工程学报,2012(4):6-12.
Wu Zhisheng,Zhang Jie. Geological Structure and Grade Division of Surrounding Rock of Karst Tunnel[J]. Journal of Railway Engineering Society,2012(4):6-12.
[6]吴治生,张杰. 岩溶隧道风险影响因素及评估[J]. 铁道工程学报,2011(10):90-95.
Wu Zhisheng,Zhang Jie. Influence Factors of Karst Tunnel Risk and Risk Assessment[J]. Journal of Railway Engineering Society,2011(10):90-95.
[7]曹化平,王科. 铁路岩溶隧道工程地质选线研究[J]. 高速铁路技术,2011(2):31-36.
Cao Huaping,Wang Ke. Study on Geological Route Selection for Railway Engineering in Karst Zone[J]. High Speed Railway Technology,2011(2):31-36.
[8]束毅力. 岩溶地区隧道施工地质灾害预报及风险控制[J]. 隧道与地下工程,2012(5):97-99.
Shu Yili. Geohazard Forecast and Risk Control of Tunneling Construction in Karst Area[J]. Tunnel & Underground Engineering,2012(5):97-99.
[9]许模. 坪山隧道区岩溶水文地质条件研究[R]. 成都:成都理工大学,2009.
Xu Mo. Karst Hydrogeology Condition Research of Pingshan Tunnel[R]. Chengdu:Chengdu University of Technology,2009.
[10]中铁二院工程集团有限责任公司. 坪山隧道D3K 462+885~D3K 463+252段岩溶整治变更设计[R]. 成都: 中铁二院工程集团有限责任公司,2012.
China Railway Eryuan Engineering Group Co.Ltd. Karst Renovation Design Changes from D3K 462+885~D3K 463+252 of Pingshan Tunnel[R]. Chengdu:China Railway Eryuan Engineering Group Co.Ltd,2012.