Study on the CP Ⅲ Vertical Control Network Establishing Method of High—speed Railway Based on Free.—station
FU Jian—bin1,LIU Cheng—long2,LU Jian—kang3,HE Bo2,YANG xue—feng2
1.Construction Management Department of MOR,Beijing 100844,China;2.Southwest Jiaotong University,Chengdu,Sichuan 610031,China;3.China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China
Abstract:Research purposes: Aiming at the measurement for establishment of high—speed railway track control network CP Ⅲ vertical control network,the paper not only analyzes the technical requirements of CP Ⅲ vertical control network but also the technical features of methods from Germany and China for establishment of vertical control network,and based on the principle of free—station in cPm plane control network,the feasibility of building CP Ⅲ trigonometric leveling net work by the observational values of free—station in CP Ⅲ plane control network is discussed.
Research conclusions:Through the introduction of the middle method of total station,CP Ⅲ trigonometric leveling network is established and compared to the prerequisite for high precision trigonometric leveling,it is considered to be feasible.At the same time,comparison and statistical analysis among actual accuracy index of large mounts of CP Ⅲ trigonometric leveling network data are done,proving that the method proposed in the paper can meet the accuracy;equirements for the second order leveling and CP Ⅲ vertical control network,SO it is a new method in establishing CP Ⅲ vertical control network.
付建斌,刘成龙,卢建康,何波,杨雪峰. 基于自由测站的高速铁路控制网建网方法研CP Ⅲ高究[J]. 铁道工程学报, 2010, 27(11): 32-37.
FU Jian—bin,LIU Cheng—long,LU Jian—kang,HE Bo,YANG xue—feng. Study on the CP Ⅲ Vertical Control Network Establishing Method of High—speed Railway Based on Free.—station. 铁道工程学报, 2010, 27(11): 32-37.
718—723. Liu Chenglong,Yang Youtao,Xu Xiaozuo.Simulated Determination of Accuracy Requirement for Control Points m Intersection Networks in High—speed Railway [J].Journal of Southwest Jiaotong Uniwersity,2008 (6):718-723.
Ni Xiantao.The Study on Vertical Network Survey and Data—-processing Method of Ballastless Track Base—- Piles CP Ⅲ[D]. Chengdu:Southwest Jiaotong University,2009.
[4]TB 10601--2009,高速铁路工程测量规范[s].
TB 10601—-2009.Code for Engineering Survey of High Speed Railway[S].
[5]GB/T 12897--2006,国家一、二等水准测量规范[S].
GB/T 12897--2006,Specifications for the First and Second Order Leveling[S].
Cheng Ang,Liu Chenglong,Xu Xiaozuo.Research on the Positional Accuracy Required for CP Ⅲ Network [J].Journal of Railway Engineering Society,2009(1): 44—45.
Xu Xiaozuo,Liu Chenglong,Yang Youtao.Research on the Detection Method of CP Ⅲ Points Stabifity in Fine Adjustment of Ballastless Track[J].Journal of Railway Engineering Society,2008(9):21—22.
Subject Group of Sueveying Adjustment,School of Geodesy and Geomaties,Wuhan University.Theory of Errors and Basis of Surveying Adjustment[M]. Wuhan:Wuhan University Press,2003.