Abstract:Wushaoling Extreme Long Tunnel begun to construct in February, 2003. Now all construction projects
are conducted orderly and the tunnel will be open to traffic in Oct. 2005.Rational selection of bed structure and
track form is essential to fitting special geological environment, guarantee the stability of bed in the tunnel and
train safe running and reducing maintenance.
袁庸瑄. 兰武线乌鞘岭特长隧道整体道床结构形式的确定[J]. 铁道工程学报, 2005, 22(4): 47-50.
YUAN Yong-xuan. DECIDE STRUCTURAL FORM OF SOLID BED IN WUSHAOLING
EXTREME LONG TUNNEL ON LANZHOU-WUWEI RAILWAY. 铁道工程学报, 2005, 22(4): 47-50.