Abstract:In the budgetary estimate of design for the Xi'an-Ankang Railway, when the contradictory appeared during the implementation of the relative policy stipulations, the adopted technique and its consideration for calculating the difference of the cost of the materials are introduced in this paper. Furthermore, the thinking and conception induced by the questions are proposed. It is emphasized that we should combine with practical situations and control & apply flexibly the relative methods and stipulations.
冯郧平,黄晋昌. 西康铁路设计概算中材差计算技巧[J]. 铁道工程学报, 2001, 18(4): 135-136.
FENG Yun-ping, HUANG Jin-chang. CALCULATING TECHNIQUE ON DIFFERENCE OF COST OF MATERIALS IN BUDGETARY ESTIMATE OF DESIGN FOR XI’AN-ANKANG RAILWAY. Journal of Railway Engineering Society, 2001, 18(4): 135-136.