Abstract:In railway roadbed construction of the end bearing pile, it often appears these phenomenons, for example, bedrock surface contact is bad, bedrock surface contact is bad, the bearing is not enough, the interface is easy to form at the soil sediment, easy to cause instability of foundation. By adopting the corresponding detection methods and the corresponding construction equipment, the railway subgrade end bearing pile bottom sediment thickness should not be greater than 50 mm, make the pile end contact good, improve the quality of construction, meet the specification requirements.Research conclusions:(1) First of all to core piles of concrete pile deeply effective basis for its pile do the reflection wave method to detect, it is concluded that pile bottom reflection wave curve positively to the characteristics, and from the reflection wave curve calculation in reflection wave velocity value.(2) The above speed value for parameters is used to detect certain pile depth by the reflection wave method. (3) Take the reflection wave method to detect certain pile depth and mechanical construction construction pile depth,if construction pile depth is greater than the reflection wave method to detect certain pile depth,the difference value is pile bottom sediment thickness. (4) A test batch should be not less than three drilling hole pile bottom sediment thickness verification,when sediment thickness more than standard requirement end bearing pile should rework processing. (5) The end bearing pile construction must selecte the end bearing mechanical equipment which meets end bearing conditions, the bearing pile construction equipment can not only be used for end bearing pile construction, also can be used for friction pile construction,but the friction pile construction equipment is not used for end bearing pile construction.
张德翔. 铁路路基端承桩施工问题探讨[J]. 铁道工程, 2014, 31(10): 54-58.
ZHANG De-xiang. Discussion on Construction Problem of the End Bearing Pile of Railway Roadbed. 铁道工程, 2014, 31(10): 54-58.
[1] JGJ 106—2003,建筑基桩检测技术规范[S]. JGJ 106—2003, Technical Code for Testing of Building Foundation Piles[S]. [2] TB 10218—2008,铁路基桩检测技术规程[S]. TB 10218—2008, Technical Code for Testing of Foundation Piles of Railway Engineering[S]. [3] JGJ 79—2002,建筑地基处理技术规范[S]. JGJ 79—2002, Technical Code for Ground Treatment of Buildings[S]. [4] GB 50021—2001,岩土工程勘察规范[S]. GB 50021—2001, Code for Investigation of Geotechnical Engineering[S]. [5] TB 10013—2004,铁路工程物理勘探规程[S]. TB 10013—2004, Code for Geophysical Prospecting of Railway Engineering[S]. [6] TB 10102—2004,铁路工程土工试验规程[S]. TB 10102—2004, Code for Soil Test of Railway Engineering[S]. [7] GB/T 50123—1999,土工试验方法标准[S]. GB/T 50123—1999, Standard for Soil Test Method[S]. [8] 常聚友,刘志军,周其祥. 路基端承灌注桩完整性及承载力研究[J].铁道工程学报,2008(2):35-39. Chang Juyou, Liu Zhijun, Zhou Qixiang. Research on the Integrity and Bearing Capacity of Column Pile for Subgrade[J]. Journal of Railway Engineering Society, 2008(2):35-39.