Abstract:For determining the saturated Liquefied soil in the high degree earthquake regions,a simplified calculating method is proposed by the author. A series of correcting coeffi-cients are suggested and have been commonly adopted.
李克强. 砂土液化判定修正系数的研究[J]. 铁道工程学报, 1995, 12(3): 90-97.
Li Keqang. RESEARCH ON CORRECTING COEFFICIENTS FOR DETER-MINING LIQUEFIED SOIL. Journal of Railway Engineering Society, 1995, 12(3): 90-97.