Abstract:Research purposes :As the construction technology,technique,equipment and materials for the high - speed railway are becoming more and more advanced,the high quality design,construction and operation are required for the high - speed railway. The fine adjustment of the catenary of high - speed railway is essential to the completion inspection of the high - speed railway,but there is no the relative subitems of the fine adjustment of the catenary of high - speed railway in the current railway engineering electrification quota. Therefore,it is necessary to do the research and work out the fine adjustment quota of the catenary of the high - speed railway in order to reasonably Determine and control the construction cost.
Research conclusions: The quota subitems of the static fine adjustment and dynamic fine adjustment of the catenary of high - speed railway should be set up separately,and the subitems of the dynamic fine adjustment should include the those for the speeds of 250 km/h, 300 km/h and 350 km/h respectively. Under the condition of the reasonable construction organization,the consumptions of the labor s and materials for the static fine adjustment and dynamic fine adjustment should be determined and the comprehensive production should be estimated. The final base price of the static fine adjustment is 3 350. 58 yuan for one catenary per kilometer and the base prices of the dynamic fine adjustments are 4 427. 13 yuan,5 060.29 yuan and 6 481. 25 yuan respectively for one catenary per kilometer for the speeds of 250 km/h,300 km/h and 350 km/h.
张桐林. 高速铁路接触网精调定额的研究[J]. 铁道工程学报, 2013, 30(5): 82-86.
ZHANG Tong – lin. Research on Fine Adjustment Quota of Catenary of High – speed Railway. 铁道工程学报, 2013, 30(5): 82-86.
TB 10621—2009, High Speed Railway Design Specification (Provisional) [ S].
[2]铁集成[2010] 166号,关于印发《高速铁路联调联试和运行试验指导意见》的通知[S].
Railway Integration [ 2010 ] No. 166,Notice on Printing and Distributing the Guiding Opinion of High Speed Railway Alignment Group Test and Operation test of Beijing[S].
[3] TB 10758—210,高速铁路电力牵引供电工程施工质量验收标准[S].
TB 10758—2010,High - speed Railway Traction Power Supply Electric Power Engineering Construction Quality Acceptance Standard [ S].
[4]铁建设[2010]241号,高速铁路电力牵引供电工程施工技术指南[S].
Railway Construction [ 2010 ] No. 241,High - speed Railway Traction Power Supply Electric Power Engineering Construction Guidance[ S].
[5]铁建设[2012] 107号,关于发布《高速铁路竣工验收办法》的通知[S].
Railway Construction[2012] No. 107,Notice on Printing and Distributing High Speed Railway Completion Acceptance Method[ S].
[6]铁建设[2010]223号,电力牵引供电工程[S].
Railway Construction [2010] No. 223,Electric Traction Power Supply Engineering[ S].
Liu Guofu. Pondering and Exploring on Developing the OCS of High - speed Electrification Railway [ J ]. Journal of Railway Engineering Society,2003(1) :122 - 125.