Abstract:Research purposes: The Heptafluoropropane automatic fire extinguishing system has been widely used for protection of the treasure goods,machine room and files room because of its high efficiency,reliability and no harm to the protected goods. But the construction of system is difficult,and the construction period is long with the high technical requirement. Therefore,it is very necessary to do research on its practical installation process for the purpose of ensuring the smooth construction progress and project acceptance.
Research conclusions: From the research and review of the installation processes of the pipe,device and alarm system and the system linkage test of a heptafluoropropane automatic fire extinguishing system for one office building,it is concluded the steel cylinder room is the core of the system. When installing and arranging the devices in the steel cylinder room,the operation space and the passage for test and maintenance should be reserved. The main a. c power to the main fire host,linkage cabinet and multi - functional console should be fed from the special UPS dual power supply in the fire control room.
陈泽希. 七氟丙烷自动灭火系统安装工艺研究[J]. 铁道工程学报, 2012, 29(1): 78-82.
CHEN Ze - xi. Research on Installation Process of Heptafluoropropane Automatic Fire Extinguishing System. 铁道工程学报, 2012, 29(1): 78-82.
Huang Dun. Comparative Study on Fire Fighting Systems for Long Underwater Tunnels of China Railway and Foreign Railways [J ]. Journal of Railway Engineering Society,2011( 8) : 68 - 72.
[5] DG/ T J08—307—2002,七氟丙烷灭火系统技术规程[S].
DG/ T J08—307—2002,Technical Specification of HFC - 227ea Extinguishing System[S].