Abstract:Research purposes:Generally the mode that the train runs across two main lines is realized by the junction lines,but the running way between the HefeiFuzhou Passenger Dedicated Line and the JiujiangJingdezhenQuzhou Mixed Traffic Line is realized by two yards and one shared track in the Wuyuan station.So the signal design needs to make a scheme to meet the transportation needs of the junction station special layout.
Research conclusions:(1)Wuyuan station designs two respective interlocking systems for the two yards,and the intersecting cross-over turnout is controlled by the interlocking system of the yard I.The route between two yards is set up by some sectional routes.(2)The signal indication turns on when the train runs from the yard 11 to the yard I,while the signal indication turns off when the train runs from the yard I to the yardⅡ.(3)Due to the automatic transition mode of every home signal,the CTCS-3/2 grade transition point does not need to be set up,when the EMU runs from the Jiujiang-Jingdezhen-Quzhou Railway to the Hefei-Fuzhou Passenger Dedicated Line.The execution point of ZX-3/2 needs to be set up Oil the 6G track.when the train runs from the yard I to the 6G track.The train control grade transition from CTCS-3 to CTCS-2 is realized by expanding the GSM-R coverage scope and setting up the action point of ZX-3/2 on section of Jiujiang direction,When the train departure from the 5G track of the yard I. (4)The temporary speed restriction is achieved by the temporary speed restriction server(TSRS)and the secure data network.(5)This signal scheme is a reference for some similar projects.
李乾社. 两线同站分场共用股道跨线方式信号方案研究[J]. 铁道工程学报, 2013, 30(12): 80-84.
LI Qian-she. Research on the Signal Technology Scheme of the Train Running Mode. Journal of Railway Engineering Society, 2013, 30(12): 80-84.
Li Hongxia.The Signal Design Solutions for the Junction Station of Zheng-Wu Passenger Dedicated Line and Hefeing-Wuhan Railway[J].Chinese Railways,2009(11):13-15.
[7]科技运[2010121号,CTCS一3级列控系统应答器应用原则(V2.0)[s].
Science and Technology Transport[2010]No.21,The Balise Application Principles of CTCS-3 Train Control System(V2.0)[S].
Shi Xianming,Zhang Minhui.The Security Analysis and Improvement of the Train Control System for high- speed Railway[J].Railway Standard Design,2012 (11):101-106.
[9] 科技运[2010]136号,CTCS-2级列控系统应答器应用原则(V2.0)[s].
Science and Technology Transport[2010]No.136,The Balise Application Principles of CTCS-2 Train Control System(V2.0)[S].