China Railway Eryuan Engineering Group Co. Ltd. Preliminary Design ( revised ) for the Extension of Guiyang South Marshalling Station and Passenger Train Outer Line Project at Terminal Station [R]. Chengdu: CREEC,2005.
[3] 中铁二院工程集团有限责任公司. 贵阳南编组站扩建及枢纽客车外绕线工程施工图—机务设备 [Z]. 成都: 中铁二院工程集团有限责任公司,2009.
China Railway Eryuan Engineering Group Co. Ltd. Final Drawing of the Extension of Guiyang South Marshalling Station and Passenger Train Outer Line Project at Terminal Station [Z]. Chengdu: CREEC, 2009.
[4] 中铁二院工程集团有限责任公司. 贵阳南编组站施工过渡工程 I 类变更设计[Z]. 成都: 中铁二院工程集团有限责任公司,2009.
China Railway Eryuan Engineering Group Co. Ltd. First Class Alteration Design for Transition Construction of Extension of Guiyang South Marshalling Station [Z]. Chengdu: CREEC,2009.
[5] TB 10004—2008,J 833—2009,铁路机务设备设计规范[S].
TB 10004—2008,J 833—2009,Railway Locomotive Facilities Design Standard [S].
[6] 赵雪梅. 机车运用成本影响因素分析 [J]. 铁道运输与经济,2009( 6) : 50 -52.
Zhao Xuemei. Analysis of Influential Factors on Locomotive Service Cost [J]. Railway Transport and Economy,2009( 6) : 50 - 52.
[7] 杨健. 铁路站场及枢纽设计理念和方法探讨 [J]. 铁道工程学报,2010( 6) : 102 -108.
Yang Jian. Discussion on Desing Concept and Method for Railway Station Yard and Terminal [J]. Journal of Railway Engineering Society,2010( 6) : 102 - 108.
[8] 彭强,尹文智,王慈光. 贵阳南站站改过渡期的运输组织优化[J]. 中国铁路,2010( 2) : 49 -52.
Peng Qiang,Yin Wenzhi,Wang Ciguang. Optimization of Transport Organization during the Rebuilding Period of Guiyang South Station [J]. Chinse Railways,2010 ( 2) : 49 -52.