|
|
Research on Comprehensive Geophysical Prospecting for Long Taihangshan Tunnel of Shijiazhuang - Taiyuan Passenger Dedicated Line |
LI Zhi - hua,ZHAO Jian - feng |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China |
|
|
Abstract Research purposes: In the reconnaissances that the survey time is pressed,lots of works should be done,the mountain is steep and the geological condition is complicated,how to choose the suitable comprehensive geophysical prospecting method and to give its full play of rapid survey with big survey depth and how to develop the inversion technique that can reflect the abnormal data on the latent danger with high precision are crucial to enhancing the survey precision and effective overcoming the complicated geological condition.
Research conclusions: For the comprehensive geophysical prospecting for the long Taihangshan Tunnel,the comprehensive prospecting was used,obtaining rapid,economical and high efficient effects,the data processing and interpreting technologies were developed,getting the clear abnormal pictures. The 73 abnormal areas were found by conducting the comprehensive geophysical prospecting and it provided the basis for determining the unfavorable geological body and water - rich area and arranging deep boring. So the survey precision was much enhanced. In the rather high level,it shows the basic study is crucial to the development and progress of the geophysical prospecting,having good scientific sense.
|
Received: 17 June 2011
|
|
|
|
|
[1] Li Zhihua. Mapping the Deep Buried long Railway Tunnel Using High - Frequency EM, a Case History in Taihangshan Tunnel[J]. SEG Expanded Abstracts,2010( 29) :833 -837.
[2] 李志华. 某新建铁路复杂长隧道岩层地质与CSAMT 特征[J]. 地球物理学进展, 2005( 4) :1190 -1195.
Li Zhihua. Geology and CSAMT Character of Long Complex Railway Tunnel[J]. Progress in Geophysics, 2005( 4) :1190 -1195.
[3] 李志华,朱旭东,复杂地质隧道的综合物探技术[J]. 铁道工程学报, 2008( 8) :58 -61.
Li Zhihua,Zhu Xudong. The Application of Integrated Geophysical Exploration Technology in the Tunnel Under the Complicated Geological Conditions[J]. Journal of Railway Engineering Society, 2008( 8) : 58 -61.
[4] 周海滨,李志华. 困难地形条件下地震反射在煤矿采空区的技术研究[J]. 铁道工程学报,2010 ( 2) : 18 -21.
Zhou Haibin,Li Zhihua. Technical Research on the Seismic Reflection in Coal Seam Gob under Difficult Terrain Condition [J ]. Journal of Railway Engineering Society,2010( 2) : 18 - 21.
[5] 杨新安,李怒放,李志华. 路基检测新技术[M]. 北京: 中国铁道出版社, 2005.
Yang Xinan, Li Nufang, Li Zhihua. Newly Technique of Detection on Subgrade[M]. Beijing:China Railway Publishing House, 2005.
[6] 郝明,董晨. 牡绥线初测综合物探[J]. 铁道勘察, 2008( 6) : 67 - 71.
Hao Ming, Dong Chen, Integrated Geophysical Prospecting for Preliminary Surveying of Mudanjiang - Suifenhe Railway[J]. Railway Investigation and Surveying, 2008( 6) : 67 - 71.
[7] 郝明,董晨. 有源无源大地电磁在玄武岩覆盖区长大隧道发挥的作用[J]. 工程地球物理学报,2009( S1) :46 - 48.
Hao Ming, Dong Chen. Influence of MT With Source and without Source in Long and Big Turnners with Basalt Buried [J ]. Chinese Journal of Engineering Geophysics, 2009( S1) : 46 - 48.
[8] 底青云,王若. 可控源音频大地电磁数据正反演及方法应用[M]. 北京: 科学出版社, 2008.
DI Qingyun,Wang Ruo. Controlled Source Auodio -freeqency Magneto Tellurics [M]. Beijing: Scientific Publications Inc, 2008.
[9] 王家映. 地球物理反演理论[M]. 北京: 高等教育出版社,2002.
Wang Jiaying. Invers Theory in Geophysics [M].Beijing: Higher Education Publications Inc, 2002.
[10] 卿三惠,杨家松,钟章队. 高压富水地层超深埋特长隧道施工技术研究[J]. 铁道工程学报, 2009( 1) : 86 -91.
Qing Sanhui,Yang Jiasong,Zhong Zhangdui. Research on the Construction Technology for Deep - buried Long Tunnel in High - pressure ang Water - rich Stratum[J]. Journal of Railway Engineering Society, 2009( 1) : 86 -91.
[11] 董晨,郝明. 一种简便的反演数据连接方法[J]. 工程地球物理学报, 2009( S1) : 159 -161.
Dong Chen,Hao Ming. A Simple Method of Inversion Data Linking [J]. Chinese Journal of Engineering Geophysics, 2009( S1) : 159 -161.
[12] 周黎明,刘天佑,刘江平,等. 复杂铁路隧道施工地质超前预报中TSP 探测技术应用研究[J]. 铁道工程学报, 2008( 1) : 37 -40.
Zhou Liming, Liu Tianyou, Liu Jiangping, etc.Research on Application Technology in Geological Forecast in Advance for Construction of Railway Tunnel[J]. Journal of Railway Engineering Society, 2008( 1) :37 -40.
|
|
|
|