铁道工程学报  2010, Vol. 27 Issue (12): 31-36    DOI:
Current Issue | Archive | Adv Search |
Reserch on Design and Construction of Long Connecting,High Pier,Large——span and Dissymmetry Continuous Rigid—Frame Bridge
LIU Zhi—jun
China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech