Dong Shenggno.Construction Works for Connecting Two Cantilever Arms of Middle Span of Continuous Girders by Suspension Grouting with Restricted Locking Measures[J].Journal of Railway Engineering Society, 1996(3):62一66.
[10]姚国文,宋文锋,周志祥.多跨连续刚构桥水平顶推力与合龙顺序优化[J].公路与汽运,2008(1):91-93.
Yao Guowen,Song Wenfeng,Zhou Zhixiang. Optimization of Horizontal Thrust and Closure Sequences for Multi—-span Continuous Rigid-—frame Bridge[J].Highways&Automotive Applications,2008 (1):91—93.