铁道工程学报  2010, Vol. 27 Issue (12): 85-88    DOI:
Current Issue | Archive | Adv Search |
Research on Design Criteria for Summer HVAC for Underground Transfer Room of Terminal of Tianjin Station
DING Shao—kun
The Third Railway Survey&Design Institute Group Cooporation,Tianjin 300251,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech