|
|
BRACKET DESIGN FOR CONSTRUCTION OF SECTION ZERO
ON PIER NO.1 AND 5 OF LIANDAGOU GRAND BRIDGE ON
HUANGYAN HIGH-SPEED HIGHWAY |
LU Ying-kun |
The Fifth Engineering Bureau Group Co. Ltd. of Chinese Railway |
|
|
Abstract In this paper, the theoretical calculation is made to the single limb bracket used in Section zero. The
assembly of Bailey bracket was adopted to main forced members of bracket, which was convenient to install and
take down.
|
Received: 11 May 2005
|
|
|
|
|
|
|
|