|
|
ANALYSIS OF ADVANTAGES AND DISADVANTAGES OF PRESTRESSED CONCRETE CONTINUOUS BOX GIRDER AND STEEL-CONCRETE COMPOSITE GIRDER |
YANG Jin-liang |
Bridge Design Department of the Third Railway Survey and Design Institute |
|
|
Abstract Prestressed concrete continuous box girder and steel-concrete composite girder are more and more adopted in construction of highway and railway. They are also widely applied in construction of Beijing- Shanghai High-speed Railway Line. This paper analyses the structure, dynamic features, construction, application and economic characteristics of these two kinds of girders, for reference to survey and design of similar works.
|
Received: 18 January 2005
|
|
|
|
|
|
|
|