|
|
DISCUSSION ON CRACK CONTROL IN CONSTRUCTION OF IN- TEGRATE BALLAST BED |
GONG Wei |
Guangzhou Metro Company |
|
|
Abstract This paper analyses the causes for the cracks in construction of integrate ballast bed of No. 2 Line of Guangzhou Metro from the aspects of concrete features, influences by tunnel structure, construction site and construction quality, pre- cents the method of controlling crack in construction of integrate ballast bed.
|
Received: 11 March 2004
|
|
|
|
|
|
|
|