Research on the Construction Scheme of Foshan West Railway Station of Guangzhou Railway Hub |
WANG Xia |
Engineering Management Center, China Railway Corporation,Beijing 100038,China |
|
|
Abstract Research purposes:Combining with the current situation and planning layout of Guangzhou railway hub, according to the nature and characteristics of railway lines,passenger flow line,urban rail transit and passenger transfer requirements,on the basis of analyzing the present situation and problems of the hub passenger transport system and the positioning and function of the newly-built Foshan West Railway Station,the paper demonstrates the relationship among the station site selection,city planning, the station building layout and transport characteristics,puts forward the reasonable scale and layout plan of station yard and station building,which provides beneficial reference for the future construction of large passenger station.
Research conclusions:(1)In economically developed areas,when railway passenger traffic and passenger flow grow too fast and exceed hub passenger capacity,a new passenger station needs to be considered.(2)About the new station site,on one hand a smooth railway line should be taken into account according to passenger traffic and passenger flow, on the other hand the accessibility of urban passenger should be considered in accordance with urban traffic planning. (3)Considering the nature and characteristics of railway lines,the station scale and layout should be designed reasonably to reduce the interference and cross,improve the sending and receiving capacity and carrying capacity. (4)The quantity and arrangement of the station building should be set reasonably according to passenger flow line,urban rail transit and passenger transfer requirements.
|
Received: 20 May 2014
|
|
|
|
|
[1] GB 50091 —2006,铁路车站及枢纽设计规范[S].
GB 50091一2006,Code for Design of Railway Station and Terminal [S].
[2] TB 10621 —2009,高速铁路设计规范(试行)[S].
TB 10621—2009,Code for Design of High Speed Railway [ S ].
[3]铁道第四勘察设计院.铁路工程设计技术手册(站场及枢纽)[M].北京:中国铁道出版社,2004.
The Fourth Railway Survey and Design Institute. Handbook of Engineering Design of Railway ( Station and the Hub) [ M]. Beijing: China Railway Publishing House,2004.
[4] GB 50090—2006,铁路线路设计规范[S].
GB 50090—2006,Code for Design of Railway Line [ S].
[5]铁道部工程鉴定中心.全国铁路主要枢纽规划图集[Z]. 北京:铁道部工程鉴定中心,2012.
Engineering Design and Appraisal Center,Ministry of Railway. The Planning Atlas of Main Terminal of National Railway [ Z]. Beijing: Engineering Design and Appraisal Center,Ministry of Railway,2012.
[6] GB 50157—2003,地铁设计规范[S].
GB 50157—2003,Code for Design of Metro [ S].
[7] GB 50490—2009,城市轨道交通技术规范[S].
GB 50490—2009,Technical Code of Urban Tail Transit [S].
[8]中铁第四勘察设计院集团有限公司.新建铁路广州枢纽佛山西站及相关工程可行性研究报告[R].武汉:中铁第四勘察设计院集团有限公司,2012.
China Railway Siyuan Survey and Design Group Co. Ltd. The Feasibility Study Report of the Newly Built Railway Hub in Guangzhou Foshan Station and Related Engineering [ R ]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd,2012.
[9]秦永平.及早规划建设我国市郊铁路和城际铁路[J]. 铁道工程学报,2014( 1):1 -9 .
Qin Yongping. Plan and Build Suburban Railway and Intercity Railway Early in China [ J ]. Journal of Railway Engineering Society,2014(1) :1 -9.
|
|
|
|