Research on the Deformation Control for Surrounding the Foundation Pit in Reconstruction and Expansion Project under Complicated Environmental Conditions |
SUN Yi |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China |
|
|
Abstract Research purposes: With rapid urban development and expansion,the foundation pit engineering of the central city is adjacent to both the existing building and basement,surrounding environment is complex,the excavation process must meet the strict protection requirements of deformation surrounding, as well as the normal use of buildings. Combined with the reconstruction foundation pit engineering design and successful practice of a certain complex building,this paper summarized the relevant design methods and measures,to provide reference for similar foundation pit engineering design.
Research conclusions:(1)The foundation pit area of reconstruction and expansion project is always complicated,with high risk and difficult to protect, high deformation control requirements and limit construction conditions,etc. ( 2)It is concluded that under the partial load levels each side of the pit deformation has obvious asymmetry. Increasing the stiffness of support system can effectively reduce the horizontal displacement and the maximum ground settlement. Following the time-space effect partitioned excavation is conducive to control the deformation and ground settlement. (3)Strengthen the information construction and process control,close the support system in time,according to the monitoring data adjust construction or grouting reinforcement.(4)This paper provides several measures to control deformation of foundation pit surrounding,has also certain reference significance to foundation pit design and implementation scheme selection for similar projects under complicated environmental conditions.
|
Received: 27 February 2014
|
|
|
|
|
[1]刘国彬,王卫东.基坑工程手册[M].中国建筑工业出版社,2009.
Liu Guobin, Wang Weidong. Excavation Engineering Manual[M].China Architecture&Building Press, 2009.
[2]赵光明,王永卿.在保护性历史建筑内进行改扩建工程的深基坑施工[J].建筑施工,2008(3);164-166.
Zhao Guangming, Wang Yongqing. Construction of Deep Foundation Pit for Renovation and Expansion Project of Protective Historical Building[J].Building Construction, 2008 ( 3 ) ;164-166.
[3]刘征.历史保护建筑改扩建的设计与应用[J].岩土工程学报,2010 ( Z1);284-289.
Liu Zheng. Design and Application of Rebuilding and Extension of Heritage Buildings[ J].Chinese Journal of Geotechnical Engineering, 2010(Z1);284-289.
[4]徐伟,潘延平中心城区深基坑工程建设周边环境风险控制指南[M].北京:中国建筑工业出版社,2011.
Xu Wei, Pan Yanping. Guide for Risk Control of Deep Excavation Engineering in the Central Urban Area [M].Beijing; China Architecture&Building Press , 2011.
[5].苗志春,熊楚炎.软土地区深基坑施工对周边浅基础建 筑物的影响与对策[[J].浙江建筑,2007(10);34-37.
Miao Zhichun, Xiong Chuyan. Influence and Countermeasure of Deep Foundation Pit Surrounding the Construction with Shallow Foundation in Soft Soil Area } J }.Zhejiang Construction, 2007(10) ;34-37.
[ 6 ] JGJ 120-2012,建筑基坑支护技术规程[S].
JGJ 120-2012, Technical Specification for Retaining and Protection of Building Foundation Excavations[S].
[7]GB 50007-2011,建筑地基基础设计规范[S].
GB 50007-2011,Code for Design of Building Foundation[S].
[8]郑刚,焦莹,李竹.基坑变形的控制指标及控制值的若干 问题[J]施工技术,2011(8);8-14.
Zheng Gang, Jiao Ying, Li Zhu. Allowable Deformation Control and Unconventional Deformation [J].Construction Technology, 2011(8) ;8-14.
[9].李进军,王卫东.紧邻地铁区间隧道深基坑工程的设计和 实践[J].铁道工程学报,2011(11);104-111.
Li Jinjun, Wang Weidong. Design and Construction of Deep Excavation Engineering Adjacent to the Subway Tunnel[ J].Journal of Railway Engineering Society, 2011(11);104-111.
[10].韩毅揉,凌旭辉.中心城区复杂环境条件下的改扩建工程 施工技术[J].建筑施工,2011(3):210-212.
Han Yirou, Lin Xuhui. Construction Technology for Expansion Project under Complicated Environmental Conditions in Downtown Area[J].Building Construction, 2011(3) ;210-212.
[11].顾开云,许磊.复杂条件下基坑变形控制—亚龙总部 大楼基坑工程设计研究[J].岩土工程学报,2006 ( Z1): 1577-1581.
Gu Kaiyun, Xu Lei. Displacement Control under Deep Foundation Pits Complicated Conditions-Design of the Foundation Pit of Yalong General Headquarters Building[J].Chinese Journal of Geotechnical Engineering, 2006 ( Zl);1577-1581.
|
|
|
|