|
|
TECHNIQUE ON TREATMENT OF KARST FOUNDATION |
LI Ya-wu |
China Railway Thirteenth Engineering Bureau Group Co.,Ltd |
|
|
Abstract Dealing with the tunnel foundation of subway during passing through the karst geology, the combination of techniques,such as Titling, rotary spraying, sleeve-tube grouting,etc,are adopted to reinforce the soft ground and to seal the karst cracks. Good effect has been obtained by the comprehensive application of the corresponding technologies.
|
Received: 21 August 2002
|
|
|
|
|
[1]杜嘉鸿,等,地下建筑注浆工程简明手册[M]科学出版 社.
[2]林宝玉,吴绍章.混凝土工程新材料设计与施工[M].中 国水利水电出版社.
[3]李克群.基础工程[M].中国铁道出版社.
|
|
|
|