Journal of Railway Engineering Society  1997, Vol. 14 Issue (2): 49-55    DOI:
Current Issue | Archive | Adv Search |
ANALYSES  ON CAUSE OF FORMATION FOR FAULTED LARGE-DIAMETER LONG CAST-IN-PLACE CONCRETE PILES AND THEIR PREVENTIVE AND REINFORCING TREATMENTS
Wa ng Wuqin
Fi rst Rai lw ay Engineering Burea u of MOR
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech