|
|
Engineering Geological Investigation and Evaluation on Stability of Coal Gob Area for Railway |
YAN Dong |
China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan,Hubei 430063,China |
|
|
Abstract Research purposes: The coal gob area is the unfavorable geological factors affecting the railway alignment. It is very complicated and it plays an important part in the stability of railway engineering. When the railway passing through the coal gob, the evaluation is made on the influences of the railway engineering by the synthetic method of geological investigation and the protective coal pillar design of railway. It can give the reliable bases on identifying the safe borders and reinforcing the coal gob and can further meet the requirements of railway engineering subsidence control.
Research conclusions:(1)Railway geological investigation of coal gob is based on the collected coal mining date. A detailed survey is carried out with geophysical survey and drilling. It can make each other verifying and complement. Then it can identify the border of coal gob. ( 2 ) According to the depth of exposing coal seam,the attitude of coal mine can be got by space geometry relation.(3)By the result of the synthetic method for geological investigation,the evaluation is made on the stability of railway and the safe border of coal gob with the protective coal pillar design of rail- way. By goof grouting reinforcement within the scope of security boundary, it can meet the requirements of railway sub- silence control. (4) This paper can provide the guidance and reference to similar engineering geological investigation and evaluation on stability of coal gob area for railway in the future.
|
Received: 20 November 2013
|
|
|
|
|
[1]童立元,刘松玉,邱钮,等.高速公路下伏采空区问题国内外研究现状及进展[J].岩石力学与工程学报,2004(4);1198-1202.
Tong Liyuan , Liu Songyu , Qiu Yu , etc. Current Research State of Problems Associated with Mined - out Regions under Expressway and Future Development [J].Chinese dourna! of Rock Mechanics and Engineering , 2004 ( 4 ) ;1198-1202.
[2]刘熙,张昆,李晓凡.铁路穿越小型采空区稳定性的评价方法研究「J].铁道工程学报,2012(12) :32-35.
Liu Xi, Zhang Kun, Li Xiaofan. Research on the Assessment Method for Stability of Railway Crossing Small-sized Mined-out Region[J].Journal of Railway Engineering Society , 2012 (12 ) ; 32-35.
[3]潘瑞林.采空区物探方法新探[J].铁道勘察,2010(6):23-25.
Pan Ruilin. New Approaches of Geophysical Exploration for Mining Zone [ J ].Railway Investigation and Surveying, 2010(6);23-25.
[4] 铁道第-勘察设计院铁路工程地质手册[M].北京:中国铁道出版社,1999.
The 15rst Railway Survey and Design Institute. Railway Engineering Geological Manual [ M].Beijing; China Railway Publishing House ,1999.
[5]国家煤炭工业局.建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[M].北京:煤炭工业出版社,2000.
State Bureau of Coal Industry. Rules for Coal Pillars Reserving and Mining Coal under Buildings, Water, Railroad, Main Roadway and Shaft[M] .Beijing: China Coal Industry Publishing House ,2000.
[6]赵建峰.采空(人为坑洞)研究[J].铁道工程学报,2005 (增刊);364-368.
Zhao Jianfeng. Research on the Gob(Man-made Cavity )[J].Journal of Railway Engineering Society , 2005(S):364-368.
[7]李国和,李桂芳.采空区铁路工程地质选线研究[J].铁道工程学报,2012(10):15-20.
Li Guohe , Li Guifang. Research on Railway Alignment in Goal「J].Journal of Railway Engineering Society , 2012(10);15-20.
[8]韦耀珑.广西沿海铁路煤矿采空区地基加固工程研究 L1}.铁道工程学报,2013(7):6-10.
Wei Yaohu. Research on reinforcements of Foundation in Coal Mine Goat for Ganged Coastal Railway[J]. Journal of Railway Engineering Society , 2013 (7) , 6-10.
|
|
|
|