Calculation Method of Foundation Ditch Enclosure Structure Considered the Erection Time of Bracings |
LIU Cheng-yu 1,XU Dai-hong 2 |
1 .Fuzhou University,Fuzhou,Fujian 350108,China;2. China Railway Erju Co. Ltd,Chengdu,Sichuan 610081 China |
|
|
Abstract Research purposes: As using the complete analysis method for beam on elastic foundation calculate the internal force as well as the displacement of the deep foundation ditch enclosure structure,the internal bracings was applied in advanced and the calculation condition was inconsistent with the actual of the construction,a method that considered the erection time of the inner bracings was proposed in this paper in order to improve the calculation accuracy.
Research conclusions: (1)As the bar-system FEM complete analysis method for beam on elastic foundation was adopted to calculate the internal force and the displacement of the foundation ditch enclosure structure,the inner bracing was defined as compression-only bar unit with initial gap,and the width of the initial gap was equal to the lateral displacement of fender piles(or enclosure wall) on the point which the inner bracings were applied at the erection time. With that the erection time of the bracings were considered in the model,which makes the internal force and displacement calculations of the enclosure structure accord the actual better.(2)Without considering the erection time of the bracings while using the complete analysis method for beam on elastic foundation,the calculated values of the lateral displacements and moments of the fender piles(or enclosure wall ) were smaller , that was not safety in practice. ( 3 ) Research findings of this paper can provide reference for the design and construction of foundation ditch enclosure structure.
|
Received: 18 June 2013
|
|
|
|
|
[1]刘国彬,王卫东.基坑工程手册(第二版)[M].北京:中国建筑工业出版社,2009.
Liu Guobin, Wang Weidong. Foundation Ditch Engineering Handbook (Edition2)[M]. Beiing:China Build Industry Press, 2009.
[2]霍润科,颜明圆,宋战平地铁车站深基坑开挖监测与数值分析[J].铁道工程学报,2011(5):81-85.
Huo Runke, Yan Mingyuan, Song Zhanping. The Monitoring and Numerical Anaysis of Deep Foundation in Subway Station [ J ].Journal of Railway Engineering Society, 2011 (5):81-85.
[3]黄胜平,韩明华.地铁换乘车站深基坑支护体系测试研究[J].铁道工程学报,2012(5):58-62.
Huang Shengping, Han Minghua. Study on Test for Supporting System for Deep Foundation Pit of Metro Transfer Station[J].Journal of Railway Engineering Society, 2012(5):58-62.
[4]任建喜,高涛.地铁换乘站深基坑围护结构变形规律 FLAG模拟研究[J].铁道工程学报,2008 (9):80-83.
Ren Jianxi, Gao Tao. Research on the Deformation Law of Deep Excavation Supporting Structure in Metro Interchange Station by FLAC Simulation[J].Journal of Railway Engineering Society , 2008 (9 ):80-83.
[5]高立新,王强,李国杰.地铁车站深基坑变形规律现场监测[J].铁道工程学报,2011(11):112-116.
Gao Lixin, Wang Qiang, Li Guojie. In-situ Monitoring of Deformation Laws of Deep Foundation Pit of Subway Station [ J ].Journal of Railway Engineering Society , 2011(11):112-116.
[6]张强勇.弹性地基梁杆系有限元法在深大基坑工程支护设计中的应用[J].建筑结构学报,2005(3):114-117.
Zhang Qiangyong. Application of Bar System FEM for Beam on Elastic Foundation in Supporting Design for a Deep and Large Foundation Pit Engineering[J]. Journal of Building Structures , 2005 ( 3 ):114-117.
[7]杨光华.深基坑支护结构的实用计算方法及其应用[J]. 岩土力学,2004 (12):1885-1896.
Yang Guanghua. Practical Calculation Method of Retaining Structures for Deep Excavations and Its Application [ J ].Rock and Soil Mechanics, 2004(12): 1885-1896.
[8]JGJ 120—99,建筑基坑支护技术规程[S].
JGJ 120—99,Technical Specification for Retaining and Protection of Building Foundation Excavations[S].
[9]北京迈达斯技术有限公司.MIDAS GTS(420版)用户手册3—分析理论[R].北京:北京迈达斯技术有限公司, 2012.
MIDAS Information Technology China Co. Ltd. MIDAS GTS ( Edition 420)User's Manual—3 Analysis Reference [R]. Beiing: MIDAS Information Technology China Co. Ltd. 2012.
|
|
|
|