Key Problems and Countermeasures in BT Projects in Infrastructure Construction |
WU Xian-guo1,JIANG Xue1,ZHANG Li-mao 1,JIANG Le2,ZHOU Jun2,ZHOU Ge-qian1 |
1 .Huazhong University of Science and Technology, Design &Research Institute Co. Ltd,Wuhan,Hubei Wuhan,Hubei 430074,China;2. Wuhan Municipal Engineering 430023,China |
|
|
Abstract Research purposes: This paper presents the key problems in the application of Build-Transfer(BT) mode in the urban infrastructure market. The mechanism and its effects underlying the existing problems are investigated. The systemic and corresponding solutions are further proposed in BT projects from the perspective of overall process management,providing effective support for the adoption and promotion of BT mode in the urban infrastructure industry.
Research conclusions:(1)Because of the short time development,poor legal mechanism and multi-party participation,there are various potential problems in the application of BT mode in the infrastructure construction. (2)Key problems in the actual construction of BT projects are identified,including insufficient early preparations, frequent design changes,difficulty in investment control,unregulated transferring behaviors,and the improper risk allocation.(3)Solutions corresponding to the above problems are proposed accordingly,including strengthening the early preparations for the decision management,improving the change management mechanism,adopting the fixed- price contracts as to standardize the investment management,setting up the transfer committee to standardize the transfer behaviors,and building the comprehensive risk management system.(4)The research conclusions can be applied in the construction and management fields of BT projects.
|
Received: 10 May 2013
|
|
|
|
|
[1]张树森.BT投融资建设模式[M]北京:中央编译出版社,2006
Zhang Shusen. BT Financing Construction Mode[M]. Beijing: Central Compilation &Translation Press, 2006.
[2]王灏.BT方式在基础设施项目中的应用研究[J]宏观经济研究,2005(10):12-16
Wang Hao. Application of BT Mode in Infrastructure Construction Project[J].Macroeconomics , 2005 (10 ): 12-16.
[3]王耀辉,马荣国.BT模式在市政交通工程项目融资中的应用分析[J]铁道工程学报,2008(1):104-107
Wang Yaohui, Ma Rongguo. Application and Analysis of BT Mode in Financing for Urban Transit[J]. Journal of Railway Engineering Society , 2008 (1):104- 107.
[4]汪淼.城市轨道交通项目融资BT模式研究[J]铁道工程学报,2009(9):98-102
Wang Miao. Research on the BT Mode for Project Financing for Urban Mass Transit[J].Journal of Railway Engineering Society,2009(9):98-102.
[5]吴青.BT投融资建设中有关法律问题的分析[J]铁道工程学报,2011(5):110-114.
Wu Qing. Analysis of Legal Problems in Investing and Financing for BT Project[J].Journal of Railway Engineering Society , 2011( 5 ):110-114.
[6]杜亚灵,尹贻林.城市轨道交通BT项目投资控制系统研究[J]建筑经济,2010(7):90-94
Du Yaling, Yin Yilin. Research on Investment Control System of Urban Mass Transit Construction under BT Mode[J].Construction Economy , 2010 ( 7) : 90-94.
[7]张立茂,吴贤国,等BT项目全面风险管理体系研究 [J]建筑经济,2011(5):68-71.
Zhang Limao, Wu Xianguo, etc. Study of BT Project Risk Management[J].Construction Economy, 2011 (5):68-71.
[8]陈湘生,容建华,等BT模式在深圳地铁5号线工程中的应用与创新[J]铁道建筑,2012(3):135-138
Chen Xiangsheng, Rong Jianhua, etc. Application and Innovation of BT Mode in Shenzhen Metro Line Five Construction [ J ].Railway Engineering , 2012 ( 3 ):135- 138.
|
|
|
|