Study on Alignment Schemes for Upgrading Existing Track and Construction of Newly-built Track in Jinchengjiang-Duyun Section of Guizhou-Guangxi Railway
HUANG Bo1, SHI Jun2
1. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China; 2. Shandong University of Technology, Zibo, Shandong 255049, China
Abstract:Research purposes:This paper mainly introduces the scheme for upgrading the existing track in Jinchengjiang-Duyun section of Guizhou-Guangxi Railway and researches the scheme for alignments of the newly -built railways of Libo-Sandu, Laocun-Dushan, Mawei-Dushan etc for the purpose of providing the reference to upgrading the existing electrified railway.
Research conclusions:From comparison and research on the various schemes, it is concluded the scheme for upgrading the existing track in Jinchengjing-Duyun section has obvious advantageous. Especially, application of this scheme can make full uses of the existing track and large operational stations along the railway line to save investment and meet the demand of local development. In addition, the existing track passes through the area with relatively better topographic and engineering geological conditions and does not pass through the famous scenery. Therefore, the track alignment in Jinchengjing-Duyun section presented in the upgrading scheme is reasonable.
黄 波;师 郡. 黔桂线金城江)都匀段改建及新建线路方案研究[J]. 铁道工程学报, 2010, 27(4): 5-9.
HUANG Bo, SHI Jun. Study on Alignment Schemes for Upgrading Existing Track and Construction of Newly-built Track in Jinchengjiang-Duyun Section of Guizhou-Guangxi Railway. 铁道工程学报, 2010, 27(4): 5-9.
Zhang Xuecai, et al. Pre-feasibility Study on Reconstruction of Guizhou-Guangxi Railway[R]. Chengdu: The Second Survey and Design Institute of China Railways, 2001.
Wang Nan, Deng Junqiao, et al. Feasibility Study on Reconstruction of Guizhou-Guangxi Railway[R]. Chengdu: The Second Survey and Design Institute of China Railways, 2003.
Lin Shijin, Deng Junqiao, et al. Preliminary Design of Guizhou-Guangxi Railway[Z]. Chengdu: The Second Survey and Design Institute of China Railways, 2004.
[ 5 ] 黄波,等.改建铁路黔桂线施工图[Z]. 成都:铁道第二勘察设计院, 2006.
Huang Bo, et al. Construction Drawing of Guizhou-Guangxi Railway[Z]. Chengdu: The Second Survey and Design Institute of China Railways, 2006.
China Railway First Survey and Design Institute Group Ltd. Technical Manual for Design of Railway Engineering-Route (Revised Edition)[K]. Beijing: China Railway Publishing House, 1994.
[ 7 ] 朱颖.铁路选线理念的创新与实践[J]. 铁道工程学报,2009(6): 1-5.
Zhu Ying, Innovation and Practice on Railway Location Concept[J]. Journal of Railway Engineering Society, 2009 (6): 1-5.
Du Yuben, Jiang L iangwen, et al. Research on the Jiezipo Syncline Karst Water System and Hazard of Water-gushing-and-bursting in Tunnel[J]. Journal of Railway Engineering Society, 2009(12): 60-64.
Zhuo Jiancheng. Research on the Engineering Arrangement Design for Railways in Difficult Mountain Area[J]. Journal of Railway Engineering Society, 2009(12): 60-64.
[ 10 ] 赵月霞.铁路建设与城市环境[J]. 铁路经济研究, 2005(4): 44-46.
Zhao Yuexia. Railway Construction and City Environment[J]. Railway Economics Research, 2005(4): 44-46.