Abstract:Research purposes: This paper resolves the problems of bad security low efficiency and low precision for the past existing railway measuring techniques.
Research methods: Surveying the existing railway by coordinate method,the core of the new technique are basing on humanity and safety , as well as cutting down the counts of surveyors. It can set the prism freely when you survey the existing railway by coordinate method. But, a separate rectangular coordinate system should be built for each cure. By this means,the measuring of mileages, the direction of railway , the little partial angle,the altitude of rail surface can be given at the same time.
Research results: Surveying the existing railway by coordinate method,the numbers of the operation flow are reduced from 5 to 2. Meanwhile,the numbers of operator are reduced from 31 to 13.Finishing the same workload , the numbers of operator are diminished 18. The numbers of the operator on line are reduced from 23 to 4. The numbers of the operator in the center of rail , where is the most dangerous,are reduced from 8 to 0. So,the factor of dangerous is mostly reduced.
Research conclusions: There are many advantages in safe producing controlling of precision and efficiency for existing railway's new measuring techniques. The aims of technique renovation are to achieve electronic records,reduce man- made errors,come true the integration of survey and design,safe production and improve benefits.