Abstract:This paper gives an introduction to the features of the construction technique for transition project of overhead contact line on existing electrified railway, including its applicable scope, construction technique, process flow, transition method, processing equipment, quality requirement, safety measures and labour organization, for reference to building the second line and carrying out the innovation for enlarging traffic capacity of existing electrified railway.
黄双胜. 既有电气化铁路接触网改造过渡工程施工工法[J]. 铁道工程学报, 2003, 20(4): 105-110.
HUANG Shuang-sheng. CONSTRUCTION TECNIQUE FOR TRANSITION PROJECT OF OVERHEAD CONTACT LINE ON EXISTING ELECTRIFIED RAILWAY. 铁道工程学报, 2003, 20(4): 105-110.