Abstract:This paper mainly introduces driven pile technique and technical measures taken in winter season for grand Yueya River Bridge on Qinhuangdao-Shenyang dedicated passenger Line, and discusses the problems of pile-body gushing, pile-top damage or pile-body cracking and its solution.
杨柏和. 秦沈客运专线月牙河特大桥打入桩施工技术[J]. 铁道工程学报, 2003, 20(2): 114-118.
YANG Bai-he. DRIVEN PILE TECHNIQUE FOR GRAND YUEYA RIVER BRIDGE ON QINHUANGDAO-SHENYANG DEDICATED PASSENGER LINE. 铁道工程学报, 2003, 20(2): 114-118.