Abstract:Yuanliang mountain tunnel is the longest tunnel in Yuhuai railway-line. Passing through high tension and richness water area,the construction of the tunnel is full of difficulties. It is intituled as the "forbidden zone of tunnel design and construction in China". The text introduces the geology advance forecast,advance grouting reinforce and timbering, grouting effect check-up and the construction process in cavity section PDK354+255~+275 of the tunnel. It offers reference for the similar projects in the future.
张民庆,韩占波,孙国庆. 圆梁山隧道进口端平导 PDK354+255~+275溶洞段施工技术[J]. 铁道工程学报, 2002, 19(4): 71-78.
ZHANG Min-qing, HAN Zhan-bo, SUN Guo-qing. CONSTRUCTION TECHNOLOGY OF CAVITY SECTION PDK354+255~+275 IN PARALLEL HEADING AT INTAKE PORTAL OF YUANLIANG MOUNTAIN TUNNEL. Journal of Railway Engineering Society, 2002, 19(4): 71-78.