Abstract:The construction schemes and the early solidified accidents of concrete during construction occurred in the Jintian-Yitian Section of the Shenzhen Subway arc introduced in this paper. The successful treatment methods for these early solidified accidents are expounded also.
王军民. 深圳地铁金益区间混凝土早凝事故的处理[J]. 铁道工程学报, 2001, 18(3): 129-131.
WANG Jun-min. TREATMENT ON EARLY SOLIDIFIED ACCIDENTS OF CONCRETE IN JINTIAN-YITIAN SECTION OF SHENZHENG SUBWAY. Journal of Railway Engineering Society, 2001, 18(3): 129-131.