摘要 本文介绍了我国铁路厂制整孔箱梁的起源及其桥面扩充方案的构思选择和试验研究。从研究设计和制造试验等方面阐述了向高速重载方向发展的铁路厂制整孔箱梁的优越性,并 阐明了作者对铁路厂制整孔箱梁研究设计和制造试验过程中的有关问题看法。
Abstract :In this article,there is an introduction of the origin of the factory-made box girder of railroad and the method of deck plate expanded. Basing upon the process of design and test of the factory-made box girder as a development mode for high-speed and heavy-Ioad, there are some advantages and viewpoints of this box girder to be expounded.
Key words :
high-speed
heavy-load
two flanks spliced joint
partially pres tressed
box girder
收稿日期: 1997-04-18
作者简介 : 彭晓华 35 岁工程师铁道部专业设计院桥隧处
[1]
王争鸣. 拉日铁路地热地区综合选线研究 [J]. 铁道工程学报, 2015, 32(9): 1-5.
[2]
成永刚1,吴六政1,赵晓彦2. 高速公路路堤滑坡成因及治理方案研究 [J]. 铁道工程学报, 2015, 32(9): 25-29.
[3]
蒲浩,郑晓强,李伟,刘威. 复杂约束条件下铁路车站自动选址研究 [J]. 铁道工程学报, 2015, 32(9): 6-12.
[4]
李金城. 黔张常铁路岩溶区坡度方案比选研究 [J]. 铁道工程学报, 2015, 32(9): 13-18.
[5]
许锐1, 郭璐1,李寻昌1,董琪2. 延安地区黑沙蒿生长特征及护坡效应研究 [J]. 铁道工程学报, 2015, 32(9): 19-24.
[6]
张峰,刘莹,许兆义,李志义. 武广高铁武汉综合试验段软土复合地基沉降分析 [J]. 铁道工程学报, 2015, 32(9): 30-34.
[7]
孙文,吴亚平,高遵明. 干寒地区路基长期稳定性及工程措施效果研究 [J]. 铁道工程学报, 2015, 32(9): 35-40.
[8]
陈文化. 重载铁路盐渍土路基中土工布使用寿命评估 [J]. 铁道工程学报, 2015, 32(9): 55-59.
[9]
周长东1,刘斌2. 简支铁路桥梁加固前后共振响应分析 [J]. 铁道工程学报, 2015, 32(9): 60-66.
[10]
杨长卫1,周峰3,杨国涛2,张建经1. 加筋土挡墙地震稳定性时频分析研究 [J]. 铁道工程学报, 2015, 32(9): 41-48.
[11]
吴红刚,张乾翼,周张博,张俊德,宋响军. 双排抗滑桩工作性能的模型试验研究 [J]. 铁道工程学报, 2015, 32(9): 49-54.
[12]
戴公连,粟淼. 斜交连续钢箱梁桥横隔板布置方式研究 [J]. 铁道工程学报, 2015, 32(9): 67-72.
[13]
康承磊1,林文泉2. 深厚软土区桥梁工程病害防范研究 [J]. 铁道工程学报, 2015, 32(9): 73-78.
[14]
朱正国,耿亚帅,武杰,朱永全,王道远,韩现民. 地震作用下隧道衬砌背后空洞影响机制研究 [J]. 铁道工程学报, 2015, 32(9): 79-84.
[15]
张民庆,何志军,游旭,吴川,高金喜. 铁路隧道底部混凝土质量评定的研究与应用 [J]. 铁道工程学报, 2015, 32(9): 85-91.