Steel Caisson Cofferdam Assembled Section by Section Construc- tion of Pier Foundation in Deep Water for Gongshui River Bridge in Beijing-Kowloon Railway
Ju Jianming Liu Hui
China Railroad Construction General Corporation Sun
Abstract:As constructing the bridge foundations in the deep water,we have adopted a new efficient construction technique, in which the steel caisson cofferdam was assembled section by section and then were settled down along a simple guiding frame. By taking the construc?tion of the foundations in deep water for the Gongshui special great river bridge in the Bei?jing-Kowloon Railway as an example, we expound in this paper the essentials of the design and the construction of the steel caisson cofferdam assembled and settled section by section in detail.
琚建明,刘晖,孙建平. 逐节拼装下沉铜箱 围堪的设计与施工[J]. 铁道工程学报, 1997, 14(3): 51-56.
Ju Jianming Liu Hui. Steel Caisson Cofferdam Assembled Section by Section Construc- tion of Pier Foundation in Deep Water for Gongshui River Bridge in Beijing-Kowloon Railway. Journal of Railway Engineering Society, 1997, 14(3): 51-56.