Abstract:In traditional surveyings,there are usually the deviation angle way,the offset way,the polar coordinate way,etc, to survey the spiral. According to the shortcomings of the above-mentioned ways,the writer start with the special spiral of Long-Yao Interchange Ramp of the No. 107 national highway (irregular spiral and no datum points) with combine the using SOKKIA SET2C— 2 Intelligent Total Station (which can directly lay out the point from the coordinate) with and the SHARP pocket computer PC—E500. On the basis of the theory of the deviation angle way,the writer go a step further to inquire into the new survey?ing way of the spiral.
贺金华. 从互通立交匝道看缓和曲线 新测法——坐标法[J]. 铁道工程学报, 1997, 14(3): 57-66.
He Jinhua. DERIVING NEW SURVEYING WAY OF THE SPIRAL ——THE COORDINATE WAY FROM INTERCHANGE RAMP. Journal of Railway Engineering Society, 1997, 14(3): 57-66.