Abstract:Based on the construction practice of the Lijiang Great Bridge for grouting the con- necting gap of the middle span of the continuous girders,there were two restricted locking mea- sures, i. e. the temporary restricted locking of the bridge supports and the temporary restricted locking of the connecting gap. This paper introduces the basic principles, calculating methods and the construction procedure of these measures. They are valuable as reference for construction works.
董盛国. 悬灌连续梁中跨合拢的约束锁定施工[J]. 铁道工程学报, 1996, 13(3): 62-66.
Dong Shengguo. CONSTRUCTION WORKS FOR CONNECTING TWO CANTILEVER ARMS OF MIDDLE SPAN OF CONTINUOUS GIRDERS BY SUSPEN- SION GROUTING WITH RESTRICTED LOCKING MEASURES. Journal of Railway Engineering Society, 1996, 13(3): 62-66.