Abstract:Research purposes: Ganzhou-Longyan Railway expansion reconstruction project is located in Fujian- Jiangxi border mountains,across the Wuyi Mountain. The topography and geological conditions along the line are very complex. The paper introduces several typical sections of the line selection in the Ganzhou-Longyan Railway expansion reconstruction project scheme, can be used as a simple reference for other mountain railway survey and design.
Research conclusions:(1)Ganzhou-Longyan Railway Reconstruction Project is located in the mountainous areas of Fujian and Jiangxi Provinces,topographic and geologic conditions are very complex. Taking full account of the length of the line,in the case of project investment, combined with the use of the existing line,the engineering geological conditions,construction difficulty,project risks,local regional planning and long-term development,the economic rational line selection works are the main features of this line.(2) Expansion reconstruction project should be as close to the existing railway corridor, easy access to both the station and the station layout with fast, general and breakout speed station program,can take advantage of the existing station building and equipment to facilitate the transport organization and management,save space and reduce local municipal facilities construction. However in some existing lines of low standard and arched linear location,combined with the economic base through a comprehensive comparison of the line than the election and engineering economics, the cut-bend program should be adopted which is combined with local urban developing plan and sets up the new station. (3)The line selection on the detail line position mainly considers engineering geological conditions, construction difficulty and risk,and uses the project feasibility as the main evaluation index. (4) The method of line selection can combine macro and local,general and detail which can subject the line program to the overall,make specific projects safe and economic,technical solutions reasonable,on-site construction feasible. (5) The result can be used as a simple reference for other mountain railway survey and design.
Li Dawang , Zhou Xiyuan , Huo Da , etc. Analysis on Condition and Seismic Response of FPS Isolation Structure [J].Engineering Seismology , 1996 (1) ; 6-9.
Li Dawang , Zhou Xiyuan , Wang Dongwei. Further Analysis on Vibratility of Friction Pendulum System [J].Journal of vibration En梦nearing, 2001(3):330- 333.
[4]李大望,关里,霍达.FPS型TMD控震效应分析[J].工业建筑,2001(2);21-23.
Li Dawang,Guan Gang, Huo Da. Effects Analysis on FPS T11, [ J ].Industrial Buildings , 2001(2) :21-23.
Yang Lin , Zhou Xiyuan , Su Youpo , etc. Experimental Research and Theoretical Analysis on Vibration Table of FPS Friction Pendulum System [J].Special Structures , [6] 2005(4);43-46.
Hu Canyang, Li Dawang. Analysis on Seismic Response of FPS Isolation Under frame to Residential Buildings [J]?Earthquake Resistant Engineering and Retrofitting, 2006 (3) ,79-82.
Peng 'I}anbo, Li Jianzhong, Fan Lichu. Development and AppVcation of Double Spherical A seismic Bearing [J].Journal of Tongji University(Natural Science ), 2007(2);176-180.
Civil King Software Technology Co. Ltd, China Institute of Building Standard Design and Research. User Manual of SAP2000 in Chinese [M].Beijing: China Communications Press , 2009.