Abstract:Research purposes: At present, there are many built highway bridge and the bridges under construction to cross the railway. With the development of local economy, there will be more and more highway bridges to cross the railway and at the same time, the new high - speed railway will inevitably under - pass the existing highway. The protective measures for the highway bridge crossing the high speed railway directly affect the high - speed railway safety. This paper discusses the protective measures for the highway bridge to cross the railway and the railway to under - pass the existing the highway bridge for making the measures more safe, more reliable and more operable.
Research conclusions :(1) The design load should be appropriately increased According to the actual road conditions and the highest grade SS of the anti - collision should be adopted. (3 ) The anti - throwing network of full - closed form or semi - closed form can be determined according to the position of the highway bridge. (3) The anti - collision and anti - throwing network can be rebuilt according to the real engineering requirement, or the scheme of the more safe, reliable and operable strong rigid frame bridge can be used for the existing highway bridge.
李吉林,孙宗磊,刘洪占. 公路上跨高速铁路桥梁防护措施方案探讨[J]. 铁道工程学报, 2013, 30(5): 52-56.
LI Ji - Iin,SUN Zong - Iei,LIU Hong - zhan. Research on Protective Measures for Highway Bridge Crossing High - speed Railway. 铁道工程学报, 2013, 30(5): 52-56.
Railway Construction [ 2012 ]No. 23,On the Design of Railway Line Project Crossing the Relevant Provisions of Notice[ S].
[3]铁运[2012]139号,关于公铁立交和公铁并行路段护栏建设与维护管理相关问题的通知[S].
Railway Transportation [ 2012 ] No. 139, On Rail Interchange and Rail Parallel Notice Road Guardrail Construction and Maintenance Management Related Issues[ S].
[4] JTJ 081—2006,公路交通安全设施设计规范[S].
JTJ 081—2006, Specification, Design of Highway Traffic Safety Facilities[ S].
[5] TB 10063—2007,铁路工程设计防火规范[S].
TB 10063—2007,Specification for Fire Protection Design of Railway Engineering [ S ].