Countermeasures for Engineering Geological Problems Faced in Construction of Lanzhou Rail Transit
YAO Wei1, HONG Zheng2, LIU Meng-meng3, TAN Dong-sheng1
1.Northwest Research Institute Co. Ltd of CREC, Lanzhou Gansu 730000, China; 2.Lanzhou University, Lanzhou, Gansu 730000, China; 3.Gansu Survey and Design Institute for Geological Disaster Prevention and Control Engineering, Lanzhou, Gansu 730050, China
Abstract:Research purposes: The engineering geological and hydrogeological conditions are rather complex along the Lanzhou rail transit, with lots of the engineering geological problems due to the big variety of rock and soil types. In order to solve the engineering geological problems better in this paper, the introduction is given to the general situation and geological environment of the Lanzhou rail transit and the main geological problems, the countermeasures for them and the ideas on the survey are presented.
Research conclusions:(1)The main geological problems of the Lanzhou rail transit included the stability of the surrounding rock, the engineering water disaster, the seepage deformation, the engineering ponding after completion of the tunnel construction and the foundation settlement. (2)The various engineering problems faced in construction of the Lanzhou rail transit could be overcome or controlled by making the reasonable design scheme and taking the corresponding construction measures, such as using the New Austrian Tunneling Method, the shield tunneling method, the open cut method, the top-down method, the underground diaphragm wall and the isolation piles etc. (3) The various technical means should be used for the geotechnical survey for the rail transit. Besides, the routine geotechnical mechanics parameters should be well known, the parameters like the resistivity and foundation bed coefficient should also be considered. In addition, the differential and corresponding surveys should be conducted for the different construction methods. (4)This study results can be applied in treatment of the engineering geological problems in construction of rail transit.
姚伟,洪政,刘蒙蒙,谭冬生. 兰州轨道交通建设中的工程地质问题与对策探讨[J]. 铁道工程学报, 2013, 30(9): 1-6.
YAO Wei, HONG Zheng, LIU Meng-meng, TAN Dong-sheng. Countermeasures for Engineering Geological Problems Faced in Construction of Lanzhou Rail Transit. 铁道工程学报, 2013, 30(9): 1-6.
Ma Qian. Research on Status and Sustainable Development of China Urban Mass Transit Project[J].Railway Signalling & Communication Engineering, 2009(8):38-39.
China Railway Frist Survey and Design Institute Group Ltd. The Lanzhou urban rail transit construction plan[R]. Xi'an: China Railway Frist Survey and Design Institute Group Ltd, 2011.
Yang Lixian, Liu Chengchang. The Ancient River and Geological Problems of Lanzhou [J].Journal of Northwest Normal University (Natural Science), 1979(2):89-95.
[4]何启明.兰州东盆地黄河古河道变迁研究[J].兰州教育学院学报,2002(4);22-27.
He Qiming. Lanzhou East Basin of the Yellow River Paleochannel Change Research [J].Journal of Lanzhou Institute of Education,2002(4) :22-27.
Cheng Jianjun, Yan Sanbao, Jiang Jianping, etc. Assessment on the Main Engineering Geological Problems in the South-north Line of Nanjing Metro[J]. Journal of Earth Science and Environmental, 2004(1):46-51.
[6]戴聚昌, 袁道阳.兰州地区活动构造的基本特征[J].高原地震,2002(3):35-40.
Dai Juchang, Yuan Daoyang. Principal Features of The Active Tectonics in Lauzhou Area [J]. Platean Earthquake Research, 2002 (3):35-40.
Guo Hongmei, Ma Peixian. The Basic Characteristics of the Beijing Railway Survey and Geological Problems[J]. West-china Exploration Engineering, 2008 (12):186-189.
Zhang Yuchuan, Yang Qunfang, Zhang Xingyuan, etc. Microstructure of Loess in Collapsibility and Seismic Subsidence [J].Journal of Lanzhou University (Natural Sciences), 2011(2):72-76.