Abstract:Research purposes: Compared with the engineering practice of the Tonghua-Guanshui section of the northeast railway corridor, the systematic analysis is made for the talus distribution,the engineering geological characteristics and the formation causes for talus. The study is done on the alignment and comprehensive survey methods for the railway in talus area. The alignment and survey methods and study ideas on the railway crossing unfavorable geological area presented in this paper can provide the reference to the similar works.
Research conclusions: (1) When the railway is built in the big unfavorable geological area which has the large impacts on alignment and engineering investment,it can not be simple to keep the railway away from the talus area,but the decision should be made after geological investigation and comprehensive comparison of the technical and economic sectors for the alignment. If necessary,a special study shall be done on the complicated and special geological problems.( 2)Talus is a kind of special unfavorable geological phenomena. For alignment in talus area,the talus distribution range,formation causes and engineering characteristics should be studied by conducting the regional geological investigation and mapping with the integrated survey methods. Based on the above principles and on consideration of the alignment design standards,function orientation and refining the partial scheme in technology and economics,the final alignment plan and engineering measures are determined. (3) The general alignment and survey methods for the railway crossing talus area stated in this paper can be used for the survey and design of transport infrastructure.
李永金. 岩堆区选线及勘察方法研究[J]. 铁道工程学报, 2013, 30(10): 1-4.
LI Yong - jin. Study on Alignment and Survey Methods in Talus Area. Journal of Railway Engineering Society, 2013, 30(10): 1-4.
National Development and Reform Commission. Official Reply for Feasibility Study of Tonghua to Guanshui Section of New-built Northeast Rail Corridor[Z]. Beijing: National Development and Reform Commission, 2007.
China International Engineering Consulting Corporation. Consulting Comments for Feasibility Study Report of Tonghua to Guanshui Section of New-builtNortheast Rail Corridor[R].Beijing: China International Engineering Consulting Corporation, 2007.
[6]工程地质手册编委会.工程地质手册(第四版)[K].北 京:中国建筑工业出版社,2007。
Editorial Committee of Engineering Geology Manual. Engineering Geology Manua (the Fourth Edition). Beijing: China Architecture &Building Press, 2007.
[7] 苗晓岐.宝中铁路增建二线六盘山越岭地质选线[J].铁 道工程学报,20l2(8):16-19。
Miao Xiaoqi .Geological Alignment of Additional Secon- Line of Baoji to Zhongwei Railway in Liupanshan Mountain Summit Area[J].Journal of Railway Engineering Society, 2012 ( 8 ) :16-19.
The 3rd Railway Survey and Design Institute Group Corporation. Feasibility Study of Tonghua to Guanshui Section of New-built Northeast Rail Corridor[R]. Tianjin: The 3rd Railway Survey and Design Institute Group Corporation, 2007.
The 3rd Railway Survey and Design Institute Group Corporation. Preliminary Design of Tonghua to Guanshui Section of New-built Northeast Rail Corridor [R].Tianjin:The 3rd Railway Survey and Design Institute Group Corporation, 2007.
Engineering Design Appraisal Center of the Ministry of Railways. Reply of Preliminary Design of Tonghua to Guanshui Section of New-built Northeast Rail Corridor [Z].Beijing: Engineering Design Appraisal Center of the Ministry of Railways , 2008.