Abstract:Abstract:Research purposes: The settlement of back fill behind abutment is the main cause for the differential settlement and the vehicle bumping at bridge-head. To explore the post-construction settlement of bridge-subgrade transition section under self weight and vehicle load, in- situ monitoring of subgrade settlement is carried out on the Lanyon highway. Settlement cells are embedded in various depths of the driveway and the shoulder of highway. Long- term settlement monitoring is conducted to investigate the variation of settlement with time and space, to provide a basic data for future research on bridge-subgrade transition section in highway construction. Research conclusions: (1) The settlement of highway shoulder is greater than that of the driveway;(2) The settlement of subgrade will increase with time, while the settlement of bridge-subgrade transition section tends to be stable after one year;(3) The vehicle load has insignificant effect on the subgrade settlement;(4) Logarithm models can predict the post-construction settlement of the subgrade accurately;(5) This research achievements can provide the reference for the design and construction of bridge-subgrade transition section.
贾亮1,梁荣1,姚凯2. 路桥过渡段路基工后沉降监测试验研究[J]. 铁道工程学报, 2017, 34(9): 18-21.
JIA Liang,LIANG Rong,YAO Kai. Research on the In-situ Monitoring of Post-construction Settlement of Bridge-subgrade Transition Section. Journal of Railway Engineering Society, 2017, 34(9): 18-21.