Abstract:Research purposes: TBased on summing up the construction method and the measures used for the loess tunnel of Xi'an subway tunnel and treatments of the water bursting when the shaft passing through the F3 ground fissures,this paper offers a set of reasonable,feasible and safe construction methods to ensure the safety of the shaft and tunnel construction for accumulating the experience to the similar projects.
Research conclusions: Application of the churning jet pile outside the shaft makes the ground water and water bursting from the fissures going out from the outside of the water curtain of the churning jet pile. At the same time,by taking the measures of the grouting reinforcement in the shaf,the precipitation in shafts,the partial excavation,the grouting down outside shafts by the flower arrangement tubes,the back cover of concrete bottom of the shaft,the drainage of groundwater in advance and the precipitation inside the tunnel,the problems of the water bursting in construction of the shaft and tunnel in the water - enrich coarse strata of loess areas are overcome.
王新洁. 地铁特殊地质黄土隧道施工技术[J]. 铁道工程学报, 2012, 29(3): 96-100.
WANG Xin - jie. Construction Technology of the Loess Subway Tunnel in Special Geological Conditions. 铁道工程学报, 2012, 29(3): 96-100.
Xin Zhenxing. Research on Optimization of Sandy Loess Large Section Tunnel Construction Methods[J].Journal of Railway Engineering Society,2011 ( 1) : 58 -61.
Gou Mingzhong. Application of Auxiliary Construction Measures in Metro Mining Method Tunnel[J]. Journal of Railway Engineering Society,2007( 5) : 95 - 98.
Xiong Xingguo. Dewatering Construction Technology in Deep Foundation Pit of Collapsible Loess Region[J].Urban Mass Transit Research,2009( 3) : 61 - 64.
Huang Qiangbing,Peng Jianbing,Gao Huyan,etc.The Longitudinal Fortified Length of Metro Tunnel Obliquely Crossing the Active Ground Fissure Zones[J]. Journal of the China Railway Society,2010 ( 1) :73 - 78.