Abstract:Research purposes: The research w as done on the driv ing and damp ing b last techno log ies for construction o f shallow small c lear - d istance tunne l of light ra il transit in X inzheng, Chongqing under the favorab le geo log ica l conditions of so ft and hard m ixed strata and the w eak rock pillar to guarantee the stabilities of the w a ll rock and supporting structure and the safety of underground pipe lines and ach ieve the good smoo th b lasting e ffect.
Research conclusions: ( 1) The large pipe roof construction was adopted to the sha llow area w ith filling so ft so il around the tunnel porta.l The positive tri- bench method, the positive b i- bench method w ith rem aining the core so i,l the positive b i- benchmethod and fu llw a ll excavationm ethod w ere used alongw ith smooth blast ing respect ively to the w all rocks of G radeⅢ, Ⅳ, Ⅴ and Ⅵ . These construction techno log ies w ere available for construction of the sha llow tunne l w ith clear- d istance of less than 5. 8 m betw een tw o tunne ls under favorab le geo log ica l condit ions. ( 2) The vibration caused by the blast ing in the cu thole was big w hen blasting for sma ll clear- distence tunne.l When the exp losion w as conducted to the areas o f the different geological condit ions w ith tw o smooth b lasting me thods ( presplitting smooth blasting and rema in ing the smooth surface layer in advance) , and the stra ight and inc lined ho ling m ethods w ere used,the v ibrat ion ve locity of the groundm easured spo tw as 1. 8 cm / s and the v ibration ve loc ity o f the sidew a ll lin ing of the ad jacent tunne lw as 11. 02 cm / s. These v ibration velocities met the code requ irements, obtaning good b lasting effec.t It show ed the damp ing blast w as feasible.
张俊兵 胡国伟. 浅埋不良地质条件下小净距隧道掘进与减振爆破技术研究[J]. 铁道工程学报, 2011, 28(1): 51-57.
ZHANG Jun- bing, HU Guo- wei. Research on Driving and Damping Blast Technologies for Construction of Shallow Small Clear- distance Tunnel under Favorable Geological Conditions. 铁道工程学报, 2011, 28(1): 51-57.
Hu Guow e,i Hao Siwang, Cheng W enbin, e tc.Controlled B lasting Technology of Liner Demolition and Expanding Excavation for the Tunne l Be ing Changed from Single - track to D ouble - track R ailway Line under Complex Condit ions [ J ]. Journal of Railw ay Engineering Society, 2009( 11): 84- 88.
Zhang Jichun. Experimental Study on V ibration Effec ts of Ground Due to Shallow Tunne l Blasting[ J]. Chinese Journal of Rock Mechanics and Engineering, 2005( 22): 4158- 4163.
Tan Zhongsheng, Yang X iaolin, W angM engshu. Effect of B lastin Double Line Tunne l on Existing Tunne l[ J].Chinese Journal of Rock M echanics and Engineering,2003( 2): 281- 285.
Bi Jihong, Zhong Jianhu.i Study on Influence of Blasting V ibration from Excavation of a New Tunnel on Existed Tunnel[ J]. Engineer ing Blasting, 2004( 4): 69 -73.
Liu Youping, L i Jianhua, Lin Daneng, etc. Theoretica land Experimental Study on Effects of Empty Ho le in Cut Blast ing[ J] . M ining R&D, 2007( 5) : 75- 77.
Y ao Yong, He Chuan. Analysis of Blasting V ibrat ion R esponse of Para llel Set Small C lear- distance Tunnels and Blast ing Control Measure s [ J ]. Rock and Soil M echanics, 2009( 9): 2816- 2882.