Su Zhiping, Bai Baoying. Research and Design of Scheme of Leading Beijing - Shenyang Passenger Dedicated Line in Fuxin Region [J] . Journal of Railway Engineering Society, 2010( 2) : 15 - 18.
[6] 彭聚才,姚遥. 杭州东站综合交通枢纽规划研究[J ]. 铁道工程学报, 2009( 3) : 1 - 3.
Peng Jucai,Yao Yao. Study on the Integrated Transportation Hubs Plan for Hangzhou East Railway Station [J]. Journal of Railway Engineering Society, 2009( 3) : 1 - 3.
[7] TB 10001—2005,铁路路基设计规范[S].
TB 10001—2005, Code for Design on Subgrade of Railway [S].
[8] 侯全德. 兰新第二双线酒泉、嘉峪关站位方案研究[J ].铁道标准设计, 2010( 12) : 1 - 3.
Hou Quande. Schemes on Station Orientation of Jiuquan and Jiayuguan on Lanzhou - Urumuqi Double Line 2[J]. Railway Standard Design, 2010( 12) : 1 - 3.
[9] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009,Code for Design of Hign Speed Railway [S].
[10] 铁建设[2005]140 号,新建时速200 ~ 250 公里客运专线铁路设计暂行规定[S].
Railway Construction Letter [2005]No. 140,Interim Provisions of Design of New Built Passenger - dedicated Railway with Speed 200 - 250 km/h [S].