Abstract Research purposes: With the rapid development of subway construction in China,the experienced designer and construction workers are not enough for design and construction of subway. This paper summarizes the experience and lessons in design and construction of subway for the purpose of giving a hand to the fresh designers and construction workers of subway.
Research conclusions: In this paper,the analysis and explanation are made and given to the problems that are ignored easily and needed for caution in subway design and construction from the aspects of the ventilation systems for subway tunnel,the ventilation and air conditioning systems for public areas and the ventilation and air - conditioning systems and air - conditioning water system for equipment control rooms.
WU Shi - qiang. Analysis of Common Problems in Design and Construction of Ventilation and Air Conditioning Systems for Subway[J]. 铁道工程学报, 2011, 28(4): 94-96.
Hou Guimin. Comparision Research on Two Kinds of Air Conditions and Ventilated Ststem in Same Subway Station[J]. Journal of Railway Engineering Society,2006( 5) : 104 - 108.