铁道工程学报  2007, Vol. 24 Issue (7): 56-60    DOI:
Current Issue | Archive | Adv Search |
Construction of Shield Tunnel in Karst Strata
YANG Yu-sang, WU Hao, XU Jian-fei , YANG Xiao-qiang
The First Engineering Bureau Group Co. Ltd. of China Railway,Xi'an, Shanxi 710054,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech