Abstract Research purposes: The researches are done on matching rapid construction technology with machinery for highland stressed weak wall rock tunnel for the purposes of setting performance of large-sized machinery in construction of highland stressed weak wall rock tunnel and providing mature and high efficient mode of matching construction machinery with construction technology.
Research conclusions: For rapid construction of the tunnel under condition of highland stressed weak wall rock, first, there should be a support with enough strength to resist the deformation of wall rock and the wall rock should be closed on time with suitable method to form a closed support ring to set performance of the support; then the construction machinery is matched according to the construction method and conditions.
|
Received: 10 October 2007
|
|
|
|
|
[1]关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.
[2]刘允芳.岩体地应力与工程建设[M].武汉:湖北科学技术出版社,2000.
[3]铁道部第一勘测设计院.乌鞘岭特长隧道F7断层和迂回导坑设计图[Z].兰州:铁道部第一勘测设计院,2004.
[4]TB 10204-2002,铁路隧道施工规范[S].
|
|
|
|