Research on Concrete of Cast-in-place Pile for Permafrost Zone in Qinghai-Tibet Plateau and Its Countermeasures |
SHI Ren-jun, PAN Ting-yu, LIU Mei-ru, ZHANG Wan |
China Academy of Railway Sciences, Beijing 100081, China |
|
|
Abstract Research purposes: The countermeasures were proposed to the technical difficulties in strength and durability of concrete, and disturbance on frozen-soil structure by thermal transmission while building bridge span structure by adopting cast-in-place concrete pile in construction of railway and highway in permafrost zone in Qinghai-Tibet Plateau.
Research methods: The research, indoor simulation test, site exposure test and tests for the pile foundations in Qing-shui River and Kunlun Mountain's port were done for the durability's damage of concrete of bridge foundation on Qinghai-Tibet Highway.
Research results: The hardening strength of concrete of pile foundation in permafrost on Qinghai-Tibet Highway couldn’t arrive at the design grade because the concrete had been in negative temperature for long term. The main reason for durability damage was freezing-thawing damage caused by alternation of positive and negative temperatures frequently, and it was found no corruption damage by surfate. The start temperature of concrete and heat of hydration made frozen-soil structure damaged in interface. The frozen soil could return to its original frozen status for long time later.
Research conclusions: The moderate-heat early-strength concrete made from air-leading water-reducing agent or early-strength air-leading water-reducing agent could meet the requirements for the strength and durability of cast-in-place concrete pile and the stability of frozen soil structure. It was necessary to note the anti-freezing agent probably had negative effect on the stability of frozen soil structure in interface and environment protection.
|
Received: 14 December 2005
|
|
|
|
|
[2] |
潘庭玉,石人俊,等.青藏铁路多年冻土地区桥涵建筑低温早强耐久混凝土的研究[R].北京:铁道部科学研究院,1979.
|
[4] |
青藏低温早强耐腐蚀高性能混凝土应用试验研究(阶段研究报告)[R].铁道科学研究院,中南大学,兰州铁道学院,铁路第一设计院,2001.
|
[5] |
杨安达,王晓兵.高原多年冻土区混凝土施工技术[J].铁道工程学报,2003(4):36-42.
|
[7] |
朱超.青藏铁路高性能泵送混凝土的研究[J].铁道建筑,2004(9):71-74.
|
[8] |
郁慕贤.青藏铁路耐久性混凝土的配制与施工控制[J].铁道建筑,2004(9):78-80
|
[1] |
石人俊,潘庭玉,刘美茹,张烷,杨于绩,孙玉福.青藏高原多年冻土地区桥基混凝土耐久性调查[R].北京:铁道部科学研究院,1976.
|
[3] |
石人俊.青藏铁路混凝土建筑物耐久性及技术对策[J].铁道建筑技术,2001(6):51-55.
|
[6] |
胡卿纪,刘德志.青藏铁路高原多年冻土区低温混凝土施工技术[J].铁道建筑,2003(5):52-54.
|
|
|
|