Abstract Research purposes: The traditional way is still adopted for treating underground water to long tunnel in karst zone. Therefore, it causes ecological environment surrounding tunnel damaged, occurrence of geological disaster and serious influence on sustainable development. This paper is written for elimination people’s misunderstanding and changing concepts.
Research methods: The demonstration is made in this paper of comparison in aspects of technical feasibility economic index and construction schedule under the same development condition of karst and underground water with taking data as basis.
Research results: The principle of “Take prevention as the dominant factor” should be kept for environmental protection. The concrete measures, construction method and caution for construction are put forward for the area for which a fully closed scheme should be adopted. The principle, primary standard and method of advanced pre-grouting are present for prevention water and drainage to long tunnel in karst zone.
Research Conclusions: The principle of full closure should be kept to long tunnel in karst zone with complex geology when geological disaster threatens the safety of construction and operation,and the worse of geological environment influences sustainable development of the area. If the scheme is correct and measures are suitable, construction will keep going on smoothly without trouble in further.
|
Received: 20 October 2005
|
|
|
|
|
[1] |
铁道部第四勘测设计院,铁道部第五工程局.南岭隧道岩溶突水涌泥地段综合整治技术[Z]. 1990.
|
[2] |
吴治生,付伯森.南岭隧道岩溶管道涌泥及治理经验[A].成都:第三届全国工程地质大会论文集[C].成都:成都科技大学出版社,1988.
|
[7] |
岩土注浆理论与工程实践协作组.岩土注浆理论与工程实践[M].北京:科学出版社,2001.
|
[9] |
DL5077-1997,水工建筑物荷载设计规范[S].
|
[6] |
铁道部科学研究院,西南交通大学.既有隧道环境地下水变化规律以及对环境生态平衡影响的评估[Z],1996.
|
[8] |
岩溶与铁道工程和环境地质的研究[Z].武汉:铁道第四勘察设计院.2004.
|
[4] |
吴治生.南岭隧道施工的地质预测预报[J].铁道工程学报,1989(3):52-58.
|
[3] |
吴治生,傅伯森.南岭隧道注浆概况及经验教训[J].铁道工程学报,1989(2):168-176.
|
[5] |
吴治生.南岭隧道地质灾害及其综合整治[J].中国地质灾害与防治学报,1993(2):72-78.
|
|
|
|